We Provide Trenchless Pipe Repair in Phoenix, AZ, and Other Areas We Serve
We realize saving time and money is a top priority for our commercial clients. These are two goals that can be easily achieved through our minimally invasive approach to repairing commercial and industrial pipes. Trenchless pipe replacement and repair is an affordable and reliable excavation alternative offered by Irontree Construction in:
Fast, Effective Results with Trenchless Repair
Trenchless sewer replacement and repair methods have been refined over the years to the point where dig-and-replace is no longer the only viable option. At Irontree, we've further fine-tuned the pipe repair process by using equipment and materials from trusted, industry-leading manufacturers. We also offer several minimally invasive options, allowing for even more flexibility.
How Trenchless Solutions Work
The goal with a trench-free approach to commercial pipe repair is to preserve the existing pipe and keep disruption minimal. For trenchless pipe repair in Phoenix, AZ, and nearby areas, we use three different methods. These are:
Irontree’s technicians arrive onsite and begin by performing a color video inspection and analysis of the deteriorated piping. With this visual information we will determine which of the three primary methods of rehabilitation will provide the most benefit and overall value. Once the best method or multiple methods are chosen, we prepare the piping interior for repair by thoroughly cleaning. The combination of hydro jetting and descaling with miller chain flares will ensure that all debris is removed, and bare metal is exposed to allow for the best epoxy adhesion. After allowing time for drying, we apply the Brush Cast epoxy one coat at a time with drying between coats. If CIPP lining, we invert the wetted-out liner and hot water or ambient cure until the epoxy has fully hardened. All lateral branch lines are then reinstated to return piping to service. When utilizing the smaller point repairs, the sectional epoxy point repair patch is wetted out around an inflatable bladder (packer), inserted into the pipe at the point of damage and inflated and allowed to cure in place.
All our epoxy processes provide a clean smooth finished product which will extend the life of your piping and provide many more years of service.
Benefit from Our Expertise
Founded in 1978, Irontree is backed by a highly dedicated and experienced team. In fact, our technicians have 200-plus years of combined experience that's a part of every project and job we do. Working with our team also means access to a wide range of service options, from trenchless pipe lining to coating. We also offer our clients maximum value and savings with meticulous planning and careful attention to detail.
There is no substitute for experience.
Every day, we embrace a higher standard of excellence, our people deliver higher quality results and we leverage our experience to achieve the best value for our clients.
Queen Creek High School Field House
The home of the Bulldogs football squad counted on our crew for CIPP lining work. Our team used 280 feet of liner for us to complete the project..
Chase Field Stadium
We are equally proud of the work we did on Chase Field, the home of the 2001 World Series champions Arizona Diamondbacks. We applied 3,000 feet of combined coating and lining for this large-scale project. We are always willing and ready to help our beloved baseball team.
J.O. Combs Unified School District
Irontree used 100 feet of liner for a combination of underground repairs and epoxy coating service.
Arizona State Prison Lewis Facility
The Irontree team is proud to be the crew that was entrusted by the Arizona Department of Corrections with the improvement of one of their 13 prison facilities. For this project, we applied over 3,600 feet of coating.
Mountain Vista Medical Center
We accomplished this work by applying 450 feet of coating.
Estrella Jail Complex
Maricopa County’s women-only facility in Phoenix, AZ, called upon our crew for major improvements to their piping systems. We responded by providing our expertise in installing 400ft of CIPP.
Diacel Safety Systems America
We applied over 500 feet of coating to fully strengthen the structures.
Mesa Boeing
5 buildings totaling over 8,000 feet of combined coating and lining.
Gila River Arena
When Gila River Arena needed a crew to conduct major improvements to their waste system, they relied on Irontree. We applied over 500 feet of coating for this project.
Centennial Village Buildings
Irontree Team worked on two prominent structures located on this beautiful eight-acre campus situated in north central Mesa. Here, we applied about 1,200 feet of coating to complete the work.
Phoenix Art Museum
Irontree Team installed 100ft of 6" liner to repair their waste piping.
Idea Tempe
For the Tempe campus of IDEA, we were tasked with conducting point repair service and relied on our experts on eight 6” x 48” point repairs to complete the job.